Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0809 # 08 Y:2020 | 08 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $620 | $34 | Implemented |
AM0809 # 09 Y:2020 | 09 | 2020 | INSTALL SPECTRAL REFLECTORS / DELAMP | $856 | $1,020 | Implemented |
BS0141 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,094 | $50 | Not Implemented |
BS0141 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $3,300 | Not Implemented |
BS0141 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $68 | $55 | Not Implemented |
BS0141 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $1,100 | Not Implemented |
BS0141 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,407 | $70,150 | Not Implemented |
BS0141 # 06 Y:2020 | 06 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,736 | $27,300 | Not Implemented |
UA0232 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,011 | $9,712 | Not Implemented |
UA0232 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,270 | $16,429 | Not Implemented |
UA0232 # 03 Y:2020 | 03 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,046 | $50 | Not Implemented |
UA0232 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $2,139 | $205 | Not Implemented |
UA0232 # 05 Y:2020 | 05 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,009 | $3,457 | Not Implemented |
UA0232 # 06 Y:2020 | 06 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $105,703 | $46,122 | Not Implemented |
SF0560 # 02 Y:2020 | 02 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,680 | $26,850 | Not Implemented |
SF0560 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,726 | $14,983 | Implemented |
SF0560 # 04 Y:2020 | 04 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,118 | $45,851 | Implemented |
SF0560 # 05 Y:2020 | 05 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,645 | $78,611 | Implemented |
SF0560 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,246 | $70 | Not Implemented |
GT0950 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,607 | $225 | Implemented |
GT0950 # 02 Y:2020 | 02 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,114 | $400 | Not Implemented |
GT0950 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,557 | $4,500 | Implemented |
GT0950 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,586 | $47,656 | Implemented |
GT0950 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $337 | $401 | Implemented |
GT0950 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $1,358 | $5,106 | Not Implemented |