IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0809 # 08 Y:2020 08 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $620 $34 Implemented
AM0809 # 09 Y:2020 09 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $856 $1,020 Implemented
BS0141 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,094 $50 Not Implemented
BS0141 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $3,300 Not Implemented
BS0141 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $68 $55 Not Implemented
BS0141 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $1,100 Not Implemented
BS0141 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,407 $70,150 Not Implemented
BS0141 # 06 Y:2020 06 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,736 $27,300 Not Implemented
UA0232 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,011 $9,712 Not Implemented
UA0232 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,270 $16,429 Not Implemented
UA0232 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,046 $50 Not Implemented
UA0232 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,139 $205 Not Implemented
UA0232 # 05 Y:2020 05 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,009 $3,457 Not Implemented
UA0232 # 06 Y:2020 06 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $105,703 $46,122 Not Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
GT0950 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,607 $225 Implemented
GT0950 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,114 $400 Not Implemented
GT0950 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,557 $4,500 Implemented
GT0950 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,586 $47,656 Implemented
GT0950 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $337 $401 Implemented
GT0950 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $1,358 $5,106 Not Implemented