IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0141 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,184 $13,550 Implemented
UF0141 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $750 Implemented
UF0141 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $945 $250 Implemented
UF0141 # 06 Y:1996 06 1996 USE LESS WASTEFUL PACKAGING $1,990 $4,000 Not Implemented
UF0140 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,090 $6,861 Implemented
UF0140 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,486 $422 Implemented
UF0140 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,236 $0 Implemented
UF0140 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,087 $350 Implemented
UF0140 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,400 $0 Implemented
UF0140 # 06 Y:1996 06 1996 UPGRADE OBSOLETE EQUIPMENT $122,659 $15,000 Not Implemented
UF0139 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $75,430 $0 Implemented
UF0139 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $18,648 $0 Implemented
UF0139 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $11,068 Not Implemented
UF0139 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,372 $57,360 Not Implemented
UF0139 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $350 Implemented
UF0139 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,271 $35,000 Not Implemented
UF0139 # 07 Y:1996 07 1996 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,581 $1,125 Not Implemented
UF0139 # 08 Y:1996 08 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,118 $10,800 Not Implemented
UF0139 # 09 Y:1996 09 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,200 $0 Not Implemented
UF0137 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,085 $5,000 Not Implemented
UF0137 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,664 $350 Implemented
UF0137 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,358 $34,340 Not Implemented
UF0137 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $9,176 $14,000 Implemented
UF0137 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Not Implemented
UF0137 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $21,580 $0 Implemented