IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,505

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0014 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $427,760 $693,530 Not Implemented
SJ0014 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,454 $17,634 Not Implemented
SJ0014 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,864 $4,784 Not Implemented
SJ0014 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,211 $1,240 Not Implemented
SJ0014 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,050 $51 Implemented
SJ0014 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,018 $0 Not Implemented
SJ0014 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $22,822 $3,080 Not Implemented
SJ0014 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $336 Not Implemented
IP0187 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $0 Not Implemented
IP0187 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $242 $74 Not Implemented
IP0187 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,797 $42,271 Not Implemented
IP0187 # 04 Y:2023 04 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $238 $1,514 Not Implemented
AS0569 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,436 $18,656 Implemented
AS0569 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,444 $7,395 Not Implemented
AS0569 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $5,717 $3,715 Implemented
AS0569 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,945 $490 Not Implemented
AS0569 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $5,151 Not Implemented
AS0569 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $146 Implemented
AS0569 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $86 Not Implemented
AS0570 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,353 $72,205 Not Implemented
AS0570 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,678 $20,940 Not Implemented
AS0570 # 03 Y:2023 03 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,395 $4,200 Not Implemented
AS0570 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,168 $3,380 Not Implemented
AS0570 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $691 $1,099 Not Implemented
AS0570 # 06 Y:2023 06 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $425 $200 Not Implemented