IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0249 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,153 $250 Implemented
WI0249 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $97 Not Implemented
WI0249 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $359 $0 Not Implemented
WI0254 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,254 $270 Implemented
WI0254 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $891 $3,960 Not Implemented
WI0254 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $909 Not Implemented
WI0254 # 04 Y:1995 04 1995 USE OPTIMUM THICKNESS INSULATION $1,323 $1,461 Implemented
WI0254 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $764 $0 Not Implemented
WI0254 # 06 Y:1995 06 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $404 $0 Implemented
WI0254 # 07 Y:1995 07 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,500 $7,000 Not Implemented
WI0252 # 01 Y:1995 01 1995 INSTALL OCCUPANCY SENSORS $2,689 $975 Not Implemented
WI0252 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,268 $6,300 Not Implemented
WI0252 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,571 $2,665 Not Implemented
WI0252 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $786 $0 Implemented
WI0252 # 05 Y:1995 05 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,698 $5,500 Not Implemented
WI0252 # 06 Y:1995 06 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $690 $1,000 Not Implemented
WI0252 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $800 Not Implemented
WI0252 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $30 Implemented
WI0252 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $911 $4,200 Not Implemented
WI0252 # 10 Y:1995 10 1995 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $543 $525 Not Implemented
BD0044 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,319 $10,060 n/a
BD0044 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,809 $675 n/a
BD0044 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,917 $754 n/a
BD0044 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $468 $300 n/a
BD0044 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $433 $480 n/a