IAC logo
IAC Assessment: BD0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1996
Principal Product Garage Doors and Door Hardware
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 101
Plant Area (Sq.Ft.) 133,900
Annual Production 199,000 Pieces
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,278 1,628,664 kWh $0.03
Electricity Demand $30,088 2,098 kW-months/year $14.34
Electricity Fees $6,654 - $ -
Natural Gas $18,130 7,463 MMBtu $2.43
TOTAL ENERGY COSTS $134,196
RECOMMENDED SAVINGS* $42,796 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,814
Cost:
$3,671
$821 25,791 $993 70 - - - - - - - - - - $821
25,791
kWh
$993
70
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,601
Cost:
$6,270
$834 26,084 $767 54 - - - - - - - - - - $834
26,084
kWh
$767
54
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,408
Cost:
$750
$1,408 44,256 - - - - - - - - - - - - $1,408
44,256
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,101
Cost:
$825
$537 16,999 $564 40 - - - - - - - - - - $537
16,999
kWh
$564
40
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$543
Cost:
$750
$543 16,999 - - - - - - - - - - - - $543
16,999
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$26,027
Cost:
$7,500
- - - - - - $1,327 147,420 - - $24,700 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,327
147,420
lb
-
-
$
$24,700
-
$
-
-
Tgal
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$9,618
Cost:
$370
- - - - - - $4,423 516,600 $5,195 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$4,423
516,600
lb
$5,195
-
$
-
-
$
-
-
Tgal
08: 3.4158 USE MINIMUM COOLING WATER TO BEARINGS Savings:
$684
Cost:
$425
- - - - $318 365,508 - - - - - - $366 - -
-
kWh
-
-
kW-months/year
$318
365,508
Tgal
-
-
lb
-
-
$
-
-
$
$366
-
Tgal
TOTAL RECOMMENDED Savings:
$42,796
Cost:
$20,561
$4,143 130,129 $2,324 164 $318 365,508 $5,750 664,020 $5,195 - $24,700 - $366 - $4,143
130,129
kWh
$2,324
164
kW-months/year
$318
365,508
Tgal
$5,750
664,020
lb
$5,195
-
$
$24,700
-
$
$366
-
Tgal
TOTAL IMPLEMENTED Savings:
$31,534
Cost:
$18,616
$3,063 96,131 $1,760 124 $318 365,508 $1,327 147,420 - - $24,700 - $366 - $3,063
96,131
kWh
$1,760
124
kW-months/year
$318
365,508
Tgal
$1,327
147,420
lb
-
-
$
$24,700
-
$
$366
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption