IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0894 # 08 Y:2014 08 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,062 $1,409 Implemented
OK0894 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $3,074 $1,972 Not Implemented
OK0894 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $141 $647 Not Implemented
OK0894 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,260 $2,090 Implemented
OK0894 # 12 Y:2014 12 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,347 $52,000 Not Implemented
OK0887 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,397 $35,374 Implemented
OK0887 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $7,219 $3,969 Implemented
OK0887 # 03 Y:2014 03 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,717 $3,613 Implemented
OK0887 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,814 $8,926 Implemented
OK0887 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,474 $11,975 Implemented
OK0887 # 06 Y:2014 06 2014 INSTALL TIMERS AND/OR THERMOSTATS $13,990 $0 Implemented
OK0887 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,993 $0 Implemented
OK0886 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,646 $17,062 Not Implemented
OK0886 # 02 Y:2014 02 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $17,969 $0 Not Implemented
OK0886 # 03 Y:2014 03 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,066 $717 Not Implemented
OK0886 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $5,915 $0 Not Implemented
OK0886 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,721 $11,599 Implemented
OK0886 # 06 Y:2014 06 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,866 $0 Implemented
OK0886 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $200 Implemented
OK0886 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $557 $0 Not Implemented
OK0886 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $548 $686 Implemented
OK0886 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $1,262 $1,188 Not Implemented
OK0886 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $555 $1,660 Implemented
OK0872 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,899 $8,580 Implemented
OK0872 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,062 $780 Implemented