Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0399 # 03 Y:2010 | 03 | 2010 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,261 | $0 | Not Implemented |
NC0399 # 04 Y:2010 | 04 | 2010 | INSULATE BARE EQUIPMENT | $1,429 | $5,438 | Implemented |
NC0399 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,471 | $0 | Implemented |
NC0399 # 06 Y:2010 | 06 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $7,151 | $23,576 | Implemented |
NC0399 # 07 Y:2010 | 07 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,943 | $8,852 | Not Implemented |
NC0399 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,744 | $1,550 | Implemented |
NC0399 # 09 Y:2010 | 09 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,805 | $6,000 | Implemented |
NC0399 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $1,592 | $2,600 | Implemented |
NC0400 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,103 | $60,000 | Not Implemented |
NC0400 # 02 Y:2010 | 02 | 2010 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $9,007 | $37,000 | Implemented |
NC0400 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,571 | $11,072 | Not Implemented |
NC0400 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $1,761 | $4,346 | Implemented |
NC0400 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $75 | $200 | Implemented |
WV0401 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,713 | $37,440 | Not Implemented |
WV0401 # 02 Y:2010 | 02 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $57,379 | $6,240 | Implemented |
WV0401 # 03 Y:2010 | 03 | 2010 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $38,419 | $128,000 | Implemented |
WV0401 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $19,593 | $1,638 | Not Implemented |
WV0401 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,792 | $7,958 | Implemented |
WV0401 # 06 Y:2010 | 06 | 2010 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,226 | $20,400 | Implemented |
WV0401 # 07 Y:2010 | 07 | 2010 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $7,432 | $16,240 | Not Implemented |
WV0401 # 08 Y:2010 | 08 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,432 | $2,028 | Implemented |
WV0401 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,622 | $312 | Implemented |
WV0401 # 10 Y:2010 | 10 | 2010 | IMPROVE LUBRICATION PRACTICES | $3,683 | $858 | Not Implemented |
WV0401 # 11 Y:2010 | 11 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,378 | $936 | Not Implemented |
WV0401 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,182 | $2,886 | Implemented |