IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0842 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $76,200 $20,000 Not Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
GT0842 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,470 $11,100 Not Implemented
DL0007 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,993 $2,583 Not Implemented
DL0007 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,672 $75 Implemented
DL0007 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,535 $140 Implemented
DL0007 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented
DL0007 # 05 Y:2007 05 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $181 $34 Implemented
DL0007 # 06 Y:2007 06 2007 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $209 $2,634 Not Implemented
DL0007 # 07 Y:2007 07 2007 REPLACE BOILER $1,325 $10,425 Implemented
DL0007 # 08 Y:2007 08 2007 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $2,561 $28,000 Not Implemented
GT0840 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,598 $30,000 Not Implemented
GT0840 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,574 $0 Not Implemented
GT0840 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,377 $14,862 Implemented
GT0840 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $2,301 Implemented
GT0840 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,943 $3,750 Implemented
GT0840 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $830 $2,500 Not Implemented
NC0368 # 01 Y:2007 01 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $42,586 $100,000 Not Implemented
NC0368 # 02 Y:2007 02 2007 DEVELOP A REPAIR/REPLACE POLICY $640 $1,297 Implemented
NC0368 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,202 $7,000 Not Implemented
NC0368 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,775 $5,800 Not Implemented
NC0368 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,986 $100 Implemented
NC0368 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $267 $960 Implemented