Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0260 # 04 Y:2007 | 04 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $685 | $0 | Implemented |
SU0260 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,644 | $1,034 | Implemented |
SU0260 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,677 | $490 | Implemented |
SU0260 # 07 Y:2007 | 07 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $142 | $739 | Not Implemented |
SU0260 # 08 Y:2007 | 08 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $151,680 | $914,460 | Not Implemented |
SU0257 # 13 Y:2007 | 13 | 2007 | OPTIMIZE PLANT POWER FACTOR | $14,173 | $42,224 | Not Implemented |
NC0368 # 01 Y:2007 | 01 | 2007 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $42,586 | $100,000 | Not Implemented |
NC0368 # 02 Y:2007 | 02 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $640 | $1,297 | Implemented |
NC0368 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,202 | $7,000 | Not Implemented |
NC0368 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,775 | $5,800 | Not Implemented |
NC0368 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,986 | $100 | Implemented |
NC0368 # 06 Y:2007 | 06 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $267 | $960 | Implemented |
NC0368 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,394 | $3,917 | Not Implemented |
NC0368 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,919 | $50 | Implemented |
LL0284 # 01 Y:2007 | 01 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $52,170 | $49,000 | Not Implemented |
LL0284 # 02 Y:2007 | 02 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,682 | $1,600 | Not Implemented |
LL0284 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,045 | $12,575 | Not Implemented |
LL0284 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,900 | $1,500 | Not Implemented |
LL0284 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,314 | $2,100 | Not Implemented |
LL0284 # 06 Y:2007 | 06 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,700 | $2,074 | Not Implemented |
LL0284 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $451 | Not Implemented |
LL0284 # 08 Y:2007 | 08 | 2007 | INSULATE BARE EQUIPMENT | $155 | $102 | Not Implemented |
SU0257 # 01 Y:2007 | 01 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,366 | $0 | Implemented |
SU0257 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,043 | $0 | Implemented |
SU0257 # 03 Y:2007 | 03 | 2007 | USE SYNTHETIC LUBRICANT | $4,349 | $0 | Implemented |