Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,973
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0041 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,396 | $6,403 | Implemented |
MU0041 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $673 | $240 | Implemented |
MU0041 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,235 | $100,548 | Implemented |
MU0041 # 07 Y:2023 | 07 | 2023 | INSTALL SET-BACK TIMERS | $86,283 | $371,500 | Implemented |
MU0041 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,605 | $0 | Implemented |
MU0041 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $270 | $189 | Not Implemented |
MU0041 # 10 Y:2023 | 10 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $4,201 | $33,470 | Not Implemented |
MU0041 # 11 Y:2023 | 11 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,870 | $5,510 | Not Implemented |
MU0041 # 12 Y:2023 | 12 | 2023 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $4,105 | $5,076 | Implemented |
CC0019 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $264 | $0 | n/a |
CC0019 # 02 Y:2023 | 02 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $80 | $180 | n/a |
CC0019 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,021 | $0 | n/a |
CC0019 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,039 | $14,918 | n/a |
CC0019 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,143 | $531,930 | n/a |
CC0019 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $50,204 | $14,000 | n/a |
MI0430 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,630 | $580 | Implemented |
MI0430 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,475 | $1,920 | Not Implemented |
MI0430 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,086 | $3,360 | Not Implemented |
MI0430 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,567 | $3,751 | Not Implemented |
MI0430 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,834 | $7,288 | Implemented |
MI0430 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,813 | $470 | Implemented |
MI0430 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,292 | $1,980 | Implemented |
UA0277 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,464 | $8,591 | Not Implemented |
UA0277 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,216 | $2,500 | Not Implemented |
UA0277 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,476 | $81,775 | Not Implemented |