Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0566 # 07 Y:1999 | 07 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,524 | $0 | Not Implemented |
UD0565 # 01 Y:1999 | 01 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $300,000 | $526,500 | Not Implemented |
UD0565 # 02 Y:1999 | 02 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $95,150 | $9,000 | Implemented |
UD0565 # 03 Y:1999 | 03 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $27,880 | $7,000 | Not Implemented |
UD0565 # 04 Y:1999 | 04 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $18,791 | $6,000 | Not Implemented |
UD0565 # 05 Y:1999 | 05 | 1999 | USE PLASTIC PALLETS INSTEAD OF WOOD | $12,625 | $25,000 | Not Implemented |
UD0565 # 06 Y:1999 | 06 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $8,240 | $6,000 | Not Implemented |
UD0565 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,182 | $1,200 | Implemented |
UD0565 # 08 Y:1999 | 08 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,143 | $15,231 | Not Implemented |
UD0565 # 09 Y:1999 | 09 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,660 | $13,660 | Not Implemented |
UD0565 # 10 Y:1999 | 10 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,846 | $2,000 | Not Implemented |
WV0160 # 01 Y:1999 | 01 | 1999 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,892 | $480 | Not Implemented |
WV0160 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $391 | $212 | Not Implemented |
WV0160 # 03 Y:1999 | 03 | 1999 | BURN A LESS EXPENSIVE GRADE OF FUEL | $2,058 | $1,200 | Not Implemented |
WV0160 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,689 | $15 | Implemented |
WV0160 # 05 Y:1999 | 05 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $142 | $0 | Implemented |
WV0160 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $830 | $130 | Implemented |
WV0160 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $333 | $214 | Not Implemented |
WV0160 # 08 Y:1999 | 08 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,624 | $16,640 | Not Implemented |
WV0160 # 09 Y:1999 | 09 | 1999 | USE OTHER WASTE CONCENTRATION METHODS | $4,680 | $140 | Not Implemented |
WV0160 # 10 Y:1999 | 10 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $776 | $5,000 | Not Implemented |
WV0160 # 11 Y:1999 | 11 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $68 | $0 | Not Implemented |
WV0160 # 12 Y:1999 | 12 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $180,000 | $11,000 | Implemented |
WV0159 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $566 | $512 | Implemented |
WV0159 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $18,085 | $24,240 | Not Implemented |