IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0088 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,197 $11,237 Not Implemented
UF0088 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,642 $15,300 Implemented
UF0088 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,275 $925 Implemented
UF0087 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,505 $10,109 Implemented
UF0087 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $360 Implemented
UF0087 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,723 $7,946 Implemented
UF0087 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $170 $300 Implemented
UF0087 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,382 $2,000 Not Implemented
UF0087 # 06 Y:1994 06 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,641 $1,500 Not Implemented
UF0087 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $800 Implemented
UF0087 # 08 Y:1994 08 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $39,992 $225,000 Implemented
UF0083 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,179 $17,575 Implemented
UF0083 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $681 $425 Implemented
UF0083 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $345 $320 Not Implemented
UF0083 # 04 Y:1994 04 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,240 $8,700 Not Implemented
UF0083 # 05 Y:1994 05 1994 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $13,781 $55,700 Not Implemented
UF0083 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $450 Not Implemented
UF0082 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $907 $1,527 Not Implemented
UF0082 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $917 $2,370 Not Implemented
UF0082 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $100 Not Implemented
UF0082 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,183 $2,250 Not Implemented
UF0082 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,957 $542 Implemented
UF0081 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,050 $298 Not Implemented
UF0081 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $320 $384 Not Implemented
UF0081 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $432 $1,818 Not Implemented