Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
906
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0006 # 01 Y:2012 | 01 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,105 | $10,500 | Not Implemented |
BS0006 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $698 | $90 | Implemented |
BS0006 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,588 | $11,386 | Not Implemented |
BS0006 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $290 | Not Implemented |
BS0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $272 | Implemented |
BS0004 # 02 Y:2012 | 02 | 2012 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,756 | $802 | Implemented |
BS0004 # 03 Y:2012 | 03 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,382 | $5,000 | Not Implemented |
BS0004 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,570 | $3,866 | Not Implemented |
BS0004 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $653 | $885 | Not Implemented |
BS0004 # 06 Y:2012 | 06 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,840 | $34 | Implemented |
BS0004 # 07 Y:2012 | 07 | 2012 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,240 | $119 | Not Implemented |
BS0003 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,118 | $296 | Implemented |
BS0003 # 02 Y:2012 | 02 | 2012 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,528 | $300 | Implemented |
BS0003 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,856 | $4,997 | Implemented |
BS0003 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $831 | $1,497 | Implemented |
BS0003 # 05 Y:2012 | 05 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $458 | $600 | Implemented |
BS0003 # 06 Y:2012 | 06 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $1,478 | $500 | Not Implemented |
BS0003 # 07 Y:2012 | 07 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $10,488 | $570 | Not Implemented |
BS0003 # 08 Y:2012 | 08 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,937 | $39,850 | Not Implemented |
BS0002 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $1,803 | $3,000 | Not Implemented |
BS0002 # 02 Y:2012 | 02 | 2012 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $106 | $320 | Not Implemented |
BS0002 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $484 | $580 | Not Implemented |
BS0002 # 04 Y:2012 | 04 | 2012 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $6,492 | $5,600 | Not Implemented |
BS0002 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,906 | $14,400 | Not Implemented |
BS0001 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $6,068 | $12,300 | Implemented |