IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0006 # 01 Y:2012 01 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,105 $10,500 Not Implemented
BS0006 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $698 $90 Implemented
BS0006 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,588 $11,386 Not Implemented
BS0006 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $290 Not Implemented
BS0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $272 Implemented
BS0004 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,756 $802 Implemented
BS0004 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,382 $5,000 Not Implemented
BS0004 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,570 $3,866 Not Implemented
BS0004 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $653 $885 Not Implemented
BS0004 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,840 $34 Implemented
BS0004 # 07 Y:2012 07 2012 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,240 $119 Not Implemented
BS0003 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,118 $296 Implemented
BS0003 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,528 $300 Implemented
BS0003 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $4,997 Implemented
BS0003 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $1,497 Implemented
BS0003 # 05 Y:2012 05 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $458 $600 Implemented
BS0003 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $1,478 $500 Not Implemented
BS0003 # 07 Y:2012 07 2012 INSTALL TIMERS AND/OR THERMOSTATS $10,488 $570 Not Implemented
BS0003 # 08 Y:2012 08 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,937 $39,850 Not Implemented
BS0002 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,803 $3,000 Not Implemented
BS0002 # 02 Y:2012 02 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $106 $320 Not Implemented
BS0002 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $484 $580 Not Implemented
BS0002 # 04 Y:2012 04 2012 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $6,492 $5,600 Not Implemented
BS0002 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,906 $14,400 Not Implemented
BS0001 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $6,068 $12,300 Implemented