Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,707
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0168 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,922 | $5,987 | Not Implemented |
DS0168 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $1,741 | $2,484 | Not Implemented |
DS0168 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,182 | $53,350 | Not Implemented |
DS0168 # 04 Y:2000 | 04 | 2000 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $871 | $511 | Implemented |
DS0168 # 05 Y:2000 | 05 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,115 | $6,647 | Implemented |
DS0168 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $5,027 | $18,608 | Not Implemented |
IA0246 # 01 Y:2000 | 01 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $19,500 | $22,000 | Not Implemented |
IA0246 # 02 Y:2000 | 02 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $18,200 | $10,275 | Not Implemented |
IA0246 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,060 | $0 | Implemented |
IA0246 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,799 | $202 | Implemented |
IA0246 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,999 | $0 | Implemented |
IA0246 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $445 | $25 | Not Implemented |
IA0246 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $56 | Not Implemented |
IA0245 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,446 | $0 | Not Implemented |
IA0245 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,424 | $3,164 | Not Implemented |
IA0245 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $791 | $0 | Implemented |
IA0245 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $186 | $25 | Implemented |
IA0245 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $142 | $335 | Not Implemented |
IA0245 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $113 | Implemented |
IA0245 # 07 Y:2000 | 07 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $97,398 | $100,000 | Implemented |
IA0245 # 08 Y:2000 | 08 | 2000 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $1,500 | $6,500 | Not Implemented |
IA0245 # 09 Y:2000 | 09 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $173 | $0 | Not Implemented |
DS0166 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,974 | $251 | Implemented |
DS0166 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,511 | $500 | Implemented |
DS0166 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,561 | $21,339 | Not Implemented |