IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0127 # 09 Y:1991 09 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $917,100 $0 Not Implemented
WI0128 # 01 Y:1991 01 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,060 $0 Implemented
WI0128 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $704 $600 Implemented
WI0128 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $755 $0 Implemented
WI0128 # 04 Y:1991 04 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $704 $2,800 Implemented
WI0128 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $633 $144 Implemented
WI0128 # 06 Y:1991 06 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $331 $700 Implemented
WI0128 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $104 $500 Implemented
WI0129 # 01 Y:1991 01 1991 INSTALL AUTOMATIC STACK DAMPER $3,952 $5,600 Not Implemented
WI0129 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,522 $0 Not Implemented
WI0129 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,859 $0 Not Implemented
WI0129 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $1,280 Not Implemented
WI0129 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $770 $238 Not Implemented
WI0129 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $767 $600 Not Implemented
WI0129 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $433 $200 Not Implemented
WI0129 # 08 Y:1991 08 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $331 $0 Not Implemented
WI0129 # 09 Y:1991 09 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70 $0 Not Implemented
MO0038 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $528 Not Implemented
MO0038 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,080 $663 Not Implemented
MO0038 # 04 Y:1991 04 1991 IMPROVE LUBRICATION PRACTICES $1,215 $960 Not Implemented
MO0038 # 05 Y:1991 05 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $344 $0 Not Implemented
MO0038 # 06 Y:1991 06 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112 $320 Not Implemented
MO0039 # 01 Y:1991 01 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $99,399 $8,205 Not Implemented
MO0039 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,998 $2,883 Not Implemented
MO0039 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $324 $0 Not Implemented