IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0446 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,392 $396 Not Implemented
UF0446 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,063 $0 Not Implemented
UF0446 # 06 Y:2011 06 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $86,813 $350,000 Not Implemented
UF0446 # 07 Y:2011 07 2011 COVER OPEN TANKS $2,910 $1,175 Not Implemented
UF0446 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,593 $25,700 Not Implemented
UF0446 # 09 Y:2011 09 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,662 $8,210 Not Implemented
SF0403 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $720 Implemented
SF0403 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,307 $2,006 Implemented
SF0403 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $681 $1,471 Implemented
SF0403 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,148 $20,097 Not Implemented
SF0403 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,026 $14,750 Not Implemented
SF0403 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,801 $5,900 Implemented
SF0403 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,142 $15,378 Not Implemented
SF0403 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,944 $9,877 Implemented
SF0403 # 09 Y:2011 09 2011 USE PHOTOCELL CONTROLS $912 $5,037 Not Implemented
UF0446 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,055 $43,715 Not Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented
NC0434 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,152 $14,895 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented
NC0434 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $100 Implemented
NC0434 # 05 Y:2011 05 2011 REPLACE BOILER $5,957 $26,400 Not Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented
NC0434 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $10,660 Implemented
NC0434 # 09 Y:2011 09 2011 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,039 $876 Implemented