IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0975 # 03 Y:2017 03 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,584 $9,120 Not Implemented
OK0975 # 04 Y:2017 04 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,312 $1,015 Not Implemented
OK0975 # 05 Y:2017 05 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $685 $0 Not Implemented
OK0975 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,429 $2,713 Not Implemented
OK0975 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,048 $438 Not Implemented
OK0975 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,181 $0 Not Implemented
OK0973 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,201 $28,109 Not Implemented
OK0973 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,650 $9,471 Not Implemented
OK0973 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,111 Not Implemented
OK0973 # 04 Y:2017 04 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,431 $12,360 Not Implemented
OK0973 # 05 Y:2017 05 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,172 $0 Not Implemented
OK0973 # 06 Y:2017 06 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $860 $769 Not Implemented
OK0973 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,356 $19,135 Not Implemented
OK0973 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,650 Not Implemented
OK0973 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $8,097 $991 Not Implemented
OK0973 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $510 Not Implemented
OK0973 # 11 Y:2017 11 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,046 $1,480 Not Implemented
OK0973 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $17,217 $17,024 Not Implemented
MI0322 # 01 Y:2017 01 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $1,663,200 $4,120,000 Implemented
MI0322 # 02 Y:2017 02 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $314,391 $1,004,370 Implemented
MI0322 # 03 Y:2017 03 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $171,697 $338,000 Implemented
MI0322 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,930 $6,000 Not Implemented
MI0322 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,753 $112,000 Not Implemented
MI0322 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,288 $72,396 Implemented
IP0090 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,309 $0 Implemented