IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0134 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,768 $1,168 Implemented
MO0134 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,895 $5,382 Implemented
MO0134 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $694 $90 Implemented
MO0134 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,574 $4,266 Not Implemented
MO0134 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $237 $350 Not Implemented
WI0220 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,282 $20,000 Not Implemented
WI0220 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,005 $500 Not Implemented
WI0220 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $4,811 $3,581 Implemented
WI0220 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,994 $4,917 Implemented
WI0220 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $254 $300 Not Implemented
WI0220 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,037 $960 Not Implemented
WI0220 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,111 $2,550 Not Implemented
WI0220 # 08 Y:1994 08 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $789 $0 Not Implemented
WI0220 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $120 Implemented
BD0014 # 01 Y:1994 01 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $206,117 $508,700 Not Implemented
BD0014 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,879 $7,000 Not Implemented
BD0014 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,398 $33,500 Implemented
BD0014 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,051 $20 Implemented
BD0014 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,150 $500 Implemented
BD0014 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,866 $2,342 Implemented
BD0014 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $2,169 $1,000 Not Implemented
WI0223 # 01 Y:1994 01 1994 REPLACE BOILER $3,696 $6,500 Not Implemented
WI0223 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,412 $2,989 Not Implemented
WI0223 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $228 $225 Not Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented