IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0261 # 01 Y:1996 01 1996 BURN A LESS EXPENSIVE GRADE OF FUEL $40,374 $40,400 Implemented
AM0261 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $9,900 $25,000 Not Implemented
AM0261 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,000 $1,300 Implemented
AM0261 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $1,000 Implemented
AM0261 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $1,020 Not Implemented
AM0261 # 06 Y:1996 06 1996 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $970 $810 Implemented
AM0261 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $617 $260 Implemented
AM0261 # 08 Y:1996 08 1996 ELIMINATE/REDUCE AN OPERATION $677 $1,030 Not Implemented
KG0048 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,326 $21,750 Implemented
KG0048 # 02 Y:1996 02 1996 USE SYNTHETIC LUBRICANT $2,934 $0 Not Implemented
KG0048 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $20 Implemented
KG0048 # 04 Y:1996 04 1996 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $712 $1,890 Implemented
KG0048 # 05 Y:1996 05 1996 RECOVER AND REUSE WASTE MATERIAL $2,282 $275 Implemented
KG0048 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $0 Implemented
KG0048 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $556 $0 Not Implemented
KG0047 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $490 $430 Not Implemented
KG0047 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,320 $7,240 Not Implemented
KG0047 # 03 Y:1996 03 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,273 $150 Implemented
KG0047 # 04 Y:1996 04 1996 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,264 $800 Implemented
KG0047 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $1,339 $0 Implemented
KG0047 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $129 Implemented
KG0047 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $40 Not Implemented
KG0047 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $934 $273 Not Implemented
KG0047 # 09 Y:1996 09 1996 INSTALL TIMERS AND/OR THERMOSTATS $265 $150 Implemented
KG0047 # 10 Y:1996 10 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79 $260 Implemented