IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0124 # 05 Y:1995 05 1995 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,043 $0 Implemented
UF0124 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $950 Not Implemented
UF0124 # 07 Y:1995 07 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,913 $100,000 Not Implemented
UF0124 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,700 $0 Implemented
UF0124 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,157 $5,000 Not Implemented
UF0130 # 11 Y:1995 11 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $29,006 $285,418 Not Implemented
UF0130 # 10 Y:1995 10 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $49,911 $0 Not Implemented
UF0130 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,542 $12,000 Implemented
UF0130 # 08 Y:1995 08 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $54,080 $250,000 Not Implemented
UF0130 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $937 $162 Implemented
UF0130 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,815 $10,658 Implemented
UF0130 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $350 Implemented
UF0130 # 04 Y:1995 04 1995 USE PHOTOCELL CONTROLS $1,056 $1,200 Implemented
UF0130 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $305 $448 Not Implemented
UF0130 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,122 $2,853 Implemented
UF0130 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,968 $10,600 Implemented
UF0129 # 01 Y:1995 01 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $115 $0 Implemented
UF0129 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,475 $1,000 Implemented
UF0129 # 03 Y:1995 03 1995 USE PHOTOCELL CONTROLS $3,673 $5,400 Implemented
UF0129 # 02 Y:1995 02 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,692 $0 Not Implemented
UF0129 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,653 $586 Implemented
UF0129 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,363 $2,828 Implemented
UF0129 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $952 $1,780 Implemented
UF0129 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $379 $666 Not Implemented
UF0129 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $775 Not Implemented