IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0382 # 12 Y:2008 12 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,884 $3,093 Not Implemented
WV0382 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $195 Implemented
WV0382 # 10 Y:2008 10 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,383 $4,160 Not Implemented
WV0382 # 09 Y:2008 09 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,240 $1,000 Not Implemented
WV0382 # 08 Y:2008 08 2008 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,689 $996 Implemented
WV0382 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,784 $224 Not Implemented
WV0382 # 06 Y:2008 06 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,768 $3,213 Implemented
WV0382 # 05 Y:2008 05 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $11,112 $100,800 Not Implemented
WV0382 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,388 $8,615 Not Implemented
WV0382 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $109,212 $38,900 Implemented
WV0382 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,966 $8,615 Not Implemented
WV0382 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $165,919 $5,500 Implemented
DL0020 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,000 $30,000 Not Implemented
DL0020 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $29,300 $125,000 Not Implemented
DL0020 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,000 $13,700 Not Implemented
DL0020 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,334 $34,037 Implemented
DL0020 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $350 Implemented
DL0020 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $63 $130 Not Implemented
LE0275 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,143 $47,522 Not Implemented
LE0275 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,241 $20,000 Not Implemented
LE0275 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,646 $6,020 Implemented
LE0275 # 03 Y:2008 03 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,225 $1,800 Implemented
LE0275 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $9,912 $5,250 Not Implemented
LE0275 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,664 $50 Implemented
LE0275 # 09 Y:2008 09 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,949 $4,000 Not Implemented