Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
256
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0382 # 12 Y:2008 | 12 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,884 | $3,093 | Not Implemented |
WV0382 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,016 | $195 | Implemented |
WV0382 # 10 Y:2008 | 10 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,383 | $4,160 | Not Implemented |
WV0382 # 09 Y:2008 | 09 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,240 | $1,000 | Not Implemented |
WV0382 # 08 Y:2008 | 08 | 2008 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $4,689 | $996 | Implemented |
WV0382 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,784 | $224 | Not Implemented |
WV0382 # 06 Y:2008 | 06 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,768 | $3,213 | Implemented |
WV0382 # 05 Y:2008 | 05 | 2008 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $11,112 | $100,800 | Not Implemented |
WV0382 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,388 | $8,615 | Not Implemented |
WV0382 # 02 Y:2008 | 02 | 2008 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $109,212 | $38,900 | Implemented |
WV0382 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,966 | $8,615 | Not Implemented |
WV0382 # 01 Y:2008 | 01 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $165,919 | $5,500 | Implemented |
DL0020 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $55,000 | $30,000 | Not Implemented |
DL0020 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $29,300 | $125,000 | Not Implemented |
DL0020 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,000 | $13,700 | Not Implemented |
DL0020 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,334 | $34,037 | Implemented |
DL0020 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $740 | $350 | Implemented |
DL0020 # 06 Y:2008 | 06 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $63 | $130 | Not Implemented |
LE0275 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,143 | $47,522 | Not Implemented |
LE0275 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,241 | $20,000 | Not Implemented |
LE0275 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,646 | $6,020 | Implemented |
LE0275 # 03 Y:2008 | 03 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,225 | $1,800 | Implemented |
LE0275 # 04 Y:2008 | 04 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $9,912 | $5,250 | Not Implemented |
LE0275 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,664 | $50 | Implemented |
LE0275 # 09 Y:2008 | 09 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,949 | $4,000 | Not Implemented |