Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0315 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,067 | $20,480 | n/a |
TT0315 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,015 | $15,600 | n/a |
TT0315 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,159 | $1,700 | n/a |
TT0315 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $204 | $184 | n/a |
TT0315 # 01 Y:2024 | 01 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $44,634 | $22,300 | n/a |
TT0311 # 07 Y:2024 | 07 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $510 | $0 | n/a |
TT0311 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,298 | $1,735 | n/a |
TT0311 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,792 | $3,400 | n/a |
TT0311 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,957 | $30 | n/a |
TT0311 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,039 | $16,000 | n/a |
TT0311 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,187 | $9,000 | n/a |
TT0311 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $52,706 | $69,233 | n/a |
TT0308 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,746 | $279,600 | Not Implemented |
TT0308 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,802 | $5,726 | Implemented |
TT0308 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,781 | $4,500 | Not Implemented |
TT0308 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,092 | $0 | Not Implemented |
TT0308 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,800 | $225 | Not Implemented |
TT0308 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $642 | $1,540 | Not Implemented |
TT0307 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $5,884 | $240 | n/a |
TT0307 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $225 | n/a |
TT0307 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,566 | $1,450 | n/a |
TT0307 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,477 | $3,890 | n/a |
TT0307 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $176,493 | $288,000 | n/a |
TT0307 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT FOR HEAT | $27,962 | $102,465 | n/a |
TT0309 # 09 Y:2024 | 09 | 2024 | METER WASTE WATER | $4,799 | $1,100 | Not Implemented |