IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0656 # 02 Y:1998 02 1998 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $5,934 $4,000 Not Implemented
GT0656 # 01 Y:1998 01 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,632 $7,000 Implemented
GT0655 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,500 $0 Not Implemented
GT0655 # 07 Y:1998 07 1998 CONVERT TO ELECTROSTATIC POWDER COATING $4,410 $5,400 Not Implemented
GT0655 # 06 Y:1998 06 1998 CONVERT TO ELECTROSTATIC POWDER COATING $7,580 $4,800 Not Implemented
GT0655 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $6,576 $0 Implemented
GT0655 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,677 $4,550 Implemented
GT0655 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,582 $3,116 Not Implemented
GT0655 # 02 Y:1998 02 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,690 $1,250 Implemented
GT0655 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $5,800 $5,000 Implemented
CO0430 # 06 Y:1998 06 1998 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $674,900 $1,645,000 Not Implemented
CO0430 # 05 Y:1998 05 1998 SELL COMBUSTIBLE WASTE $15,970 $56,700 Implemented
CO0430 # 04 Y:1998 04 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $-210 $2,000 Implemented
CO0430 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,280 Implemented
CO0430 # 02 Y:1998 02 1998 INSTALL TURBULATORS $1,770 $5,750 Not Implemented
CO0430 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $12,077 Implemented
AS0240 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $9,143 Not Implemented
AS0240 # 02 Y:1998 02 1998 INSTALL SKYLIGHTS $2,417 $7,500 Not Implemented
AS0240 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,175 $8,691 Implemented
AS0240 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,086 $3,800 Implemented
AS0240 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $4,646 $30 Implemented
AS0240 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,896 $60 Implemented
AS0240 # 07 Y:1998 07 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $37,961 $240 Not Implemented
AS0240 # 08 Y:1998 08 1998 MODIFY STARTUP/SHUTDOWN TIMES $41,874 $2,680 Not Implemented
BD0125 # 09 Y:1998 09 1998 PAY UTILITY BILLS ON TIME $465 $0 Implemented