IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0070 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $47,591 $5,500 Not Implemented
MS0385 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,422 $5,076 Not Implemented
MS0385 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,574 $14,352 Not Implemented
MS0385 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,570 $351 Not Implemented
MS0385 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $521 $670 Not Implemented
MS0385 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $470 Not Implemented
UA0069 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $800 Not Implemented
UA0069 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,441 $800 Not Implemented
UA0069 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $1,300 Not Implemented
UA0069 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $596 $398 Not Implemented
UA0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $3,200 Not Implemented
UA0069 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $678 $2,578 Not Implemented
UA0069 # 06 Y:2011 06 2011 USE OPTIMUM THICKNESS INSULATION $25,829 $16,900 Not Implemented
UA0069 # 07 Y:2011 07 2011 USE OPTIMUM THICKNESS INSULATION $5,314 $1,750 Not Implemented
UA0069 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $6,558 $7,600 Not Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
UD0845 # 05 Y:2011 05 2011 REDUCE HEAT GAIN BY WINDOW TINTING $533 $0 Not Implemented
UD0845 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $286 $1,500 Not Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0845 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,244 $500 Not Implemented
WV0439 # 16 Y:2011 16 2011 INSTALL OCCUPANCY SENSORS $298 $518 Not Implemented
WV0439 # 15 Y:2011 15 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $1,000 Implemented
WV0439 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $3,000 Implemented
WV0439 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,536 $9,580 Not Implemented