Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0218 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,078 | $12,500 | Not Implemented |
WM0099 # 01 Y:2016 | 01 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,017 | $11,200 | Not Implemented |
WM0099 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,528 | $0 | Not Implemented |
WM0099 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $12,056 | Not Implemented |
WM0099 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $2,414 | $4,360 | Not Implemented |
WM0099 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,368 | $2,600 | Not Implemented |
WM0099 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $902 | $2,200 | Not Implemented |
WM0099 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $861 | $900 | Not Implemented |
WM0099 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $733 | $2,000 | Not Implemented |
WM0099 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $685 | $481 | Not Implemented |
WM0099 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $358 | $120 | Implemented |
WM0099 # 11 Y:2016 | 11 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $344 | $0 | Implemented |
WM0099 # 12 Y:2016 | 12 | 2016 | INSULATE BARE EQUIPMENT | $274 | $315 | Implemented |
DL0171 # 13 Y:2016 | 13 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $890 | $4,170 | Not Implemented |
DL0171 # 12 Y:2016 | 12 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,030 | $0 | Implemented |
DL0171 # 11 Y:2016 | 11 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,192 | $3,840 | Not Implemented |
DL0171 # 10 Y:2016 | 10 | 2016 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,505 | $1,524 | Not Implemented |
DL0171 # 09 Y:2016 | 09 | 2016 | INSTALL AUTOMATIC STACK DAMPER | $624 | $205 | Not Implemented |
DL0171 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,911 | $588 | Not Implemented |
DL0171 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,885 | $0 | Implemented |
DL0171 # 06 Y:2016 | 06 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $431 | Not Implemented |
DL0171 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,572 | $11,400 | Not Implemented |
DL0171 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,863 | $11,400 | Not Implemented |
DL0171 # 03 Y:2016 | 03 | 2016 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $374 | $0 | Implemented |
DL0171 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,059 | $4,224 | Not Implemented |