IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0001 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,506 $35,200 Implemented
BS0001 # 03 Y:2012 03 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,703 $0 Implemented
BS0001 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,535 $1,894 Not Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $5,640 Not Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented
OR0525 # 01 Y:2007 01 2007 $246,000 $900,000 Not Implemented
OR0525 # 02 Y:2007 02 2007 $19,700 $0 Implemented
OR0525 # 03 Y:2007 03 2007 $5,000 $25,000 Not Implemented
OR0525 # 04 Y:2007 04 2007 $2,900 $6,400 Implemented
OR0525 # 05 Y:2007 05 2007 $1,300 $1,900 Implemented
OR0524 # 01 Y:2007 01 2007 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $489,500 $250,000 Implemented
OR0524 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $3,500 Implemented
OR0524 # 03 Y:2007 03 2007 UPGRADE CONTROLS ON COMPRESSORS $13,700 $35,000 Implemented
OR0524 # 04 Y:2007 04 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,100 $0 Implemented
OR0524 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,000 $0 Not Implemented
OR0524 # 06 Y:2007 06 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,800 $1,300 Not Implemented
OR0524 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $13,800 $19,200 Not Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 02 Y:2007 02 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $77,000 $5,000 Not Implemented
OR0523 # 03 Y:2007 03 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,350,000 $32,700 Not Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
OR0523 # 05 Y:2007 05 2007 COVER OPEN TANKS $3,000 $9,000 Not Implemented