Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0064 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $274 | $800 | Not Implemented |
ST0064 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,195 | $2,700 | Not Implemented |
ST0064 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $12,081 | $0 | Implemented |
ST0064 # 07 Y:1986 | 07 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,137 | $5,000 | Implemented |
ST0064 # 08 Y:1986 | 08 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $526 | $627 | Implemented |
ST0064 # 09 Y:1986 | 09 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $22,494 | $30,000 | Not Implemented |
ST0064 # 10 Y:1986 | 10 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $6,774 | $2,100 | Implemented |
ST0065 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,024 | $0 | Implemented |
ST0065 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,556 | $0 | Implemented |
ST0065 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,589 | $537 | Implemented |
ST0065 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,060 | $1,449 | Not Implemented |
ST0065 # 05 Y:1986 | 05 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $337 | $1,167 | Implemented |
ST0065 # 06 Y:1986 | 06 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $787 | $1,775 | Implemented |
ST0065 # 07 Y:1986 | 07 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,073 | $10,000 | Not Implemented |
ST0065 # 08 Y:1986 | 08 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,912 | $3,500 | Not Implemented |
ST0065 # 09 Y:1986 | 09 | 1986 | INSTALL STORM WINDOWS AND DOORS | $2,355 | $1,700 | Not Implemented |
ST0066 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,389 | $1,400 | Implemented |
ST0066 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $0 | Implemented |
ST0066 # 03 Y:1986 | 03 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $100 | Implemented |
ST0066 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,655 | $200,000 | Not Implemented |
ST0066 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,141 | $40,000 | Not Implemented |
ST0066 # 06 Y:1986 | 06 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,041 | $0 | Implemented |
ST0066 # 07 Y:1986 | 07 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $5,537 | $1,000 | Implemented |
ST0066 # 08 Y:1986 | 08 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $65 | $200 | Not Implemented |
ST0066 # 09 Y:1986 | 09 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $181 | $160 | Not Implemented |