IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0035 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,075 $743 Implemented
IA0035 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,061 $1,705 Implemented
IA0035 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $1,990 $2,313 Implemented
IA0035 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $200 Implemented
IA0035 # 05 Y:1992 05 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $928 $710 Not Implemented
IA0035 # 06 Y:1992 06 1992 INSTALL TIMERS AND/OR THERMOSTATS $723 $600 Implemented
IA0036 # 01 Y:1992 01 1992 INSTALL TIMERS AND/OR THERMOSTATS $7,499 $4,050 Not Implemented
IA0036 # 02 Y:1992 02 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $697 $2,520 Not Implemented
IA0036 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $713 $594 Not Implemented
IA0036 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,712 $200 Not Implemented
IA0036 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $445 $150 Not Implemented
IA0036 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $364 $0 Not Implemented
IA0036 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $48 Not Implemented
IA0036 # 08 Y:1992 08 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $145 $110 Not Implemented
IA0036 # 09 Y:1992 09 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $75 $0 Not Implemented
IA0037 # 01 Y:1992 01 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $37,186 $40,120 Not Implemented
IA0037 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,697 $2,500 Implemented
IA0037 # 03 Y:1992 03 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,475 $2,628 Not Implemented
IA0037 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,383 $600 Not Implemented
IA0037 # 05 Y:1992 05 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,117 $600 Not Implemented
IA0037 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,046 $3,050 Implemented
KU0383 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,666 $0 Not Implemented
KU0383 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,849 $0 Implemented
KU0383 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,893 $1,380 Not Implemented
KU0383 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $275 $80 Implemented