Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0545 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $9,979 | $4,778 | Not Implemented |
IA0545 # 04 Y:2015 | 04 | 2015 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,172 | $620 | Implemented |
IA0545 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,267 | $4,620 | Implemented |
IA0545 # 06 Y:2015 | 06 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $231 | $292 | Implemented |
WV0516 # 01 Y:2015 | 01 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $10,801 | $12,000 | Implemented |
WV0516 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,983 | $2,875 | Implemented |
WV0516 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,046 | $1,000 | Implemented |
WV0516 # 04 Y:2015 | 04 | 2015 | INSULATE BARE EQUIPMENT | $1,885 | $234 | Not Implemented |
WV0516 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,706 | $1,288 | Implemented |
WV0516 # 06 Y:2015 | 06 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,304 | $595 | Not Implemented |
WV0516 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,248 | $4,483 | Implemented |
WV0516 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,057 | $105 | Implemented |
SU0396 # 01 Y:2015 | 01 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $813 | $0 | Implemented |
SU0396 # 02 Y:2015 | 02 | 2015 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $738 | $0 | Implemented |
SU0396 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $0 | Not Implemented |
SU0396 # 04 Y:2015 | 04 | 2015 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $243 | $0 | Implemented |
SU0396 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,889 | $930 | Implemented |
SU0396 # 06 Y:2015 | 06 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,027 | $20,360 | Implemented |
SU0396 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $1,250 | Not Implemented |
SU0396 # 08 Y:2015 | 08 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,009 | $17,408 | Implemented |
SU0396 # 09 Y:2015 | 09 | 2015 | ELIMINATE/REDUCE AN OPERATION | $1,222 | $2,440 | Not Implemented |
SU0396 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $0 | Implemented |
SU0396 # 11 Y:2015 | 11 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $112 | $462 | Not Implemented |
SU0396 # 12 Y:2015 | 12 | 2015 | ADD AREA LIGHTING SWITCHES | $781 | $3,851 | Not Implemented |
OR0660 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,000 | $250,000 | Implemented |