IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0682 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,468 $7,325 Implemented
MA0680 # 01 Y:2011 01 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,371 $45,123 Implemented
MA0680 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $3,229 $2,895 Implemented
MA0680 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $630 $2,895 Implemented
MA0680 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $2,000 Not Implemented
MA0680 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $151 $0 Implemented
MA0684 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $23,122 $40,000 Implemented
MA0684 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $14,891 $3,700 Implemented
MA0684 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,358 $15,000 Implemented
MA0684 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,744 $0 Not Implemented
MA0684 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $3,360 $10,625 Not Implemented
MA0684 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,502 $2,200 Implemented
MA0684 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,402 $2,100 Implemented
MAS014 # 01 Y:2011 01 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $47,869 $10,650 Not Implemented
MAS014 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,371 $17,325 Not Implemented
MAS014 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,256 $8,190 Not Implemented
MAS014 # 04 Y:2011 04 2011 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,288 $2,070 Not Implemented
MAS014 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,033 $200 Not Implemented
MAS014 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $700 Not Implemented
MAS014 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $200 Not Implemented
MA0677 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $9,048 $2,585 Implemented
MA0677 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $4,053 $200 Not Implemented
MA0677 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,514 $5,967 Implemented
MA0677 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,225 $200 Implemented
MA0677 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $912 $8,300 Not Implemented