Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,475
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0572 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,783 | $0 | n/a |
SU0572 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,651 | $0 | n/a |
SU0572 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,576 | $0 | n/a |
SU0572 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $144 | $0 | n/a |
SU0572 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,035 | $65 | n/a |
SU0572 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $813 | $771 | n/a |
SU0572 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $673 | $691 | n/a |
SU0572 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,746 | $5,006 | n/a |
SU0572 # 09 Y:2025 | 09 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $167 | $359 | n/a |
SU0572 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,664 | $180,240 | n/a |
SD0672 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,489 | $112,796 | n/a |
SD0672 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,678 | $2,631 | n/a |
SD0672 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $565 | $847 | n/a |
SD0672 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,349 | $0 | n/a |
SD0672 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,016 | $8,765 | n/a |
SD0672 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,804 | $3,518 | n/a |
SD0672 # 07 Y:2025 | 07 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,634 | $0 | n/a |
SD0672 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,315 | $2,000 | n/a |
SD0672 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,737 | $8,530 | n/a |
SD0672 # 10 Y:2025 | 10 | 2025 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $43,311 | $4,700 | n/a |
IP0209 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,808 | $0 | n/a |
IP0209 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,072 | $0 | n/a |
IP0209 # 03 Y:2025 | 03 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $910 | $0 | n/a |
IP0209 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $336 | $0 | n/a |
IP0209 # 05 Y:2025 | 05 | 2025 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,829 | $238 | n/a |