IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0442 # 04 Y:2003 04 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,900 $0 Implemented
OR0442 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $0 Implemented
OR0442 # 06 Y:2003 06 2003 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $580 $1,400 Not Implemented
MI0068 # 01 Y:2003 01 2003 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $2,625 $80 Not Implemented
MI0068 # 02 Y:2003 02 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,426 $285 Not Implemented
MI0068 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $155 Not Implemented
MI0068 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $29 Implemented
MI0068 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $8,099 $169 Not Implemented
LL0177 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,804 $4,160 Implemented
LL0177 # 02 Y:2003 02 2003 PAY UTILITY BILLS ON TIME $2,710 $30 Implemented
LL0177 # 03 Y:2003 03 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,193 $316 Implemented
LL0177 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $1,253 $1,600 Implemented
LL0177 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,131 $235 Not Implemented
LL0177 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,096 $665 Not Implemented
LL0177 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $30 $43 Implemented
LL0177 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $448 $40 Not Implemented
SF0270 # 01 Y:2003 01 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,671 $0 Not Implemented
SF0270 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $244 $0 Not Implemented
SF0270 # 03 Y:2003 03 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $9,405 $4,145 Not Implemented
SF0270 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,226 $9,485 Implemented
SF0270 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,081 $830 Not Implemented
SF0270 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $3,975 $10,800 Implemented
SF0270 # 07 Y:2003 07 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,034 $0 Not Implemented
SF0270 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,418 $9,500 Not Implemented
SF0270 # 09 Y:2003 09 2003 ADOPT IN-HOUSE MATERIAL GENERATION $15,179 $80,393 Not Implemented