Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0473 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,330 | $18,955 | Not Implemented |
UD0472 # 01 Y:1995 | 01 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,440 | $30,000 | Implemented |
UD0472 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,193 | $300 | Implemented |
UD0472 # 03 Y:1995 | 03 | 1995 | USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS | $5,725 | $0 | Not Implemented |
UD0472 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,365 | $25,782 | Implemented |
UD0472 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,630 | $37,500 | Not Implemented |
UD0471 # 01 Y:1995 | 01 | 1995 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $46,950 | $180,000 | Implemented |
UD0471 # 02 Y:1995 | 02 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $26,000 | $50,000 | Implemented |
UD0471 # 03 Y:1995 | 03 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,642 | $600 | Implemented |
UD0471 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,786 | $3,320 | Implemented |
UD0471 # 05 Y:1995 | 05 | 1995 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,313 | $200 | Implemented |
UD0471 # 06 Y:1995 | 06 | 1995 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $54,000 | $7,500 | Implemented |
UD0470 # 01 Y:1995 | 01 | 1995 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $12,036 | $15,000 | Implemented |
UD0470 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $619 | $2,500 | Not Implemented |
UD0470 # 03 Y:1995 | 03 | 1995 | DISCONNECT BALLASTS | $934 | $100 | Not Implemented |
UD0469 # 01 Y:1995 | 01 | 1995 | COMBINE UTILITY METERS | $3,256 | $0 | Implemented |
UD0469 # 02 Y:1995 | 02 | 1995 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,980 | $3,000 | Not Implemented |
UD0469 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $227 | $392 | Implemented |
UD0469 # 04 Y:1995 | 04 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,522 | $1,000 | Not Implemented |
UD0469 # 05 Y:1995 | 05 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,600 | $20,000 | Not Implemented |
WV0075 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,706 | $855 | Implemented |
WV0075 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,349 | $22,310 | Implemented |
WV0075 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $493 | $600 | Implemented |
WV0075 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,722 | $378 | Not Implemented |
WV0075 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,783 | $250 | Implemented |