IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0473 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,330 $18,955 Not Implemented
UD0472 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,440 $30,000 Implemented
UD0472 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,193 $300 Implemented
UD0472 # 03 Y:1995 03 1995 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $5,725 $0 Not Implemented
UD0472 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,365 $25,782 Implemented
UD0472 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $14,630 $37,500 Not Implemented
UD0471 # 01 Y:1995 01 1995 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $46,950 $180,000 Implemented
UD0471 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $26,000 $50,000 Implemented
UD0471 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,642 $600 Implemented
UD0471 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,786 $3,320 Implemented
UD0471 # 05 Y:1995 05 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,313 $200 Implemented
UD0471 # 06 Y:1995 06 1995 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $54,000 $7,500 Implemented
UD0470 # 01 Y:1995 01 1995 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $12,036 $15,000 Implemented
UD0470 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $619 $2,500 Not Implemented
UD0470 # 03 Y:1995 03 1995 DISCONNECT BALLASTS $934 $100 Not Implemented
UD0469 # 01 Y:1995 01 1995 COMBINE UTILITY METERS $3,256 $0 Implemented
UD0469 # 02 Y:1995 02 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,980 $3,000 Not Implemented
UD0469 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $392 Implemented
UD0469 # 04 Y:1995 04 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,522 $1,000 Not Implemented
UD0469 # 05 Y:1995 05 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,600 $20,000 Not Implemented
WV0075 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,706 $855 Implemented
WV0075 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,349 $22,310 Implemented
WV0075 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $493 $600 Implemented
WV0075 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,722 $378 Not Implemented
WV0075 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,783 $250 Implemented