Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0473 # 04 Y:2016 | 04 | 2016 | COVER OPEN TANKS | $52,272 | $2,335 | n/a |
UM0473 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,899 | $2,835 | n/a |
UM0473 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,291 | $23,462 | n/a |
UM0473 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $2,449 | $630 | n/a |
UM0473 # 08 Y:2016 | 08 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,901 | $10,265 | n/a |
UM0472 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,171 | $1,000 | n/a |
UM0472 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,743 | $18,830 | n/a |
UM0472 # 03 Y:2016 | 03 | 2016 | ADD AREA LIGHTING SWITCHES | $22,157 | $2,680 | n/a |
UM0472 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,915 | $12,000 | n/a |
UM0471 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,290 | $500 | n/a |
UM0471 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $1,462 | $1,750 | n/a |
UM0471 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $696 | $2,500 | n/a |
UM0471 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,519 | $5,500 | n/a |
UM0471 # 05 Y:2016 | 05 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,664 | $3,435 | n/a |
UM0470 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,893 | $2,000 | n/a |
UM0470 # 02 Y:2016 | 02 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,012 | $5,000 | n/a |
UM0470 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,272 | $2,500 | n/a |
UM0470 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $819 | $3,700 | n/a |
UM0469 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,139 | $1,000 | Not Implemented |
UM0469 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,118 | $5,200 | Not Implemented |
UM0469 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,961 | $20,000 | Not Implemented |
UM0469 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,415 | $1,500 | Not Implemented |
UM0469 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $601 | $1,000 | Not Implemented |
UM0468 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $695 | $1,500 | Not Implemented |
UM0468 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $2,150 | Not Implemented |