Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0531 # 05 Y:1999 | 05 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $600 | $0 | Not Implemented |
KU0531 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $91,030 | $325,000 | Not Implemented |
KU0530 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,910 | $8,800 | n/a |
KU0530 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $520 | n/a |
KU0530 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $620 | $730 | n/a |
KU0530 # 04 Y:1999 | 04 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $55,080 | $1,380 | n/a |
KU0530 # 05 Y:1999 | 05 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $11,600 | $10,670 | n/a |
CO0451 # 01 Y:1999 | 01 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,190 | $6,250 | Not Implemented |
CO0451 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,080 | $4,000 | Implemented |
CO0451 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $220 | $20 | Implemented |
CO0451 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $190 | $320 | Implemented |
CO0451 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20 | $0 | Not Implemented |
KU0527 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $80 | Implemented |
KU0527 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $490 | Implemented |
KU0527 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $80 | Implemented |
KU0527 # 04 Y:1999 | 04 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $16,440 | $53,740 | Not Implemented |
KU0527 # 05 Y:1999 | 05 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $115,200 | $60,680 | Not Implemented |
KU0527 # 06 Y:1999 | 06 | 1999 | AUTOMATE FINISHING PROCESS | $56,160 | $92,600 | Implemented |
IA0224 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $632 | $201 | n/a |
IA0224 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,480 | $0 | n/a |
IA0224 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,124 | $6,836 | n/a |
IA0224 # 04 Y:1999 | 04 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $541 | $692 | n/a |
IA0224 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $248 | $75 | n/a |
IA0224 # 06 Y:1999 | 06 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $240 | $600 | n/a |
IA0224 # 07 Y:1999 | 07 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $92 | $25 | n/a |