IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
UD1021 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,902 $7,800 Not Implemented
UD1021 # 11 Y:2020 11 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $249 $240 Not Implemented
UD1020 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,633 $8,000 Not Implemented
UD1020 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $52,332 $47,243 Not Implemented
UD1020 # 03 Y:2020 03 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $13,712 $26,275 Not Implemented
UD1020 # 04 Y:2020 04 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,584 $27,600 Not Implemented
UD1020 # 05 Y:2020 05 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,639 $6,550 Not Implemented
UD1020 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,337 $22,400 Not Implemented
UD1020 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $901 $0 Not Implemented
UD1020 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $832 $0 Not Implemented
UD1019 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,684 $0 Implemented
UD1019 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,924 $1,000 Not Implemented
UD1019 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,086 $0 Not Implemented
UD1019 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,326 $1,400 Not Implemented
UD1019 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,713 $11,014 Not Implemented
UD1019 # 06 Y:2020 06 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,134 $7,500 Not Implemented
UD1019 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,619 $82,620 Implemented
UD1019 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,469 $10,920 Not Implemented
WV0596 # 01 Y:2020 01 2020 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $103,798 $40,718 Implemented
WV0596 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,186 $20,034 Implemented
WV0596 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $7,560 $7,967 Implemented
WV0596 # 04 Y:2020 04 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,964 $30 Not Implemented
WV0596 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $6,754 $7,949 Implemented
WV0596 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,079 $10,000 Implemented