Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1021 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $16,106 | $2,800 | Implemented |
UD1021 # 10 Y:2020 | 10 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,902 | $7,800 | Not Implemented |
UD1021 # 11 Y:2020 | 11 | 2020 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $249 | $240 | Not Implemented |
UD1020 # 01 Y:2020 | 01 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $11,633 | $8,000 | Not Implemented |
UD1020 # 02 Y:2020 | 02 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $52,332 | $47,243 | Not Implemented |
UD1020 # 03 Y:2020 | 03 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $13,712 | $26,275 | Not Implemented |
UD1020 # 04 Y:2020 | 04 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,584 | $27,600 | Not Implemented |
UD1020 # 05 Y:2020 | 05 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,639 | $6,550 | Not Implemented |
UD1020 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,337 | $22,400 | Not Implemented |
UD1020 # 07 Y:2020 | 07 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $901 | $0 | Not Implemented |
UD1020 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $832 | $0 | Not Implemented |
UD1019 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,684 | $0 | Implemented |
UD1019 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,924 | $1,000 | Not Implemented |
UD1019 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,086 | $0 | Not Implemented |
UD1019 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,326 | $1,400 | Not Implemented |
UD1019 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,713 | $11,014 | Not Implemented |
UD1019 # 06 Y:2020 | 06 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $21,134 | $7,500 | Not Implemented |
UD1019 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,619 | $82,620 | Implemented |
UD1019 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,469 | $10,920 | Not Implemented |
WV0596 # 01 Y:2020 | 01 | 2020 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $103,798 | $40,718 | Implemented |
WV0596 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,186 | $20,034 | Implemented |
WV0596 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $7,560 | $7,967 | Implemented |
WV0596 # 04 Y:2020 | 04 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,964 | $30 | Not Implemented |
WV0596 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,754 | $7,949 | Implemented |
WV0596 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,079 | $10,000 | Implemented |