IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0375 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $2,848 $9,500 Not Implemented
OR0375 # 04 Y:2000 04 2000 REDUCE SCRAP PRODUCTION $81,000 $21,000 Not Implemented
OR0375 # 05 Y:2000 05 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $45,562 $2,451 Implemented
OR0375 # 06 Y:2000 06 2000 REDUCE SCRAP PRODUCTION $12,255 $0 Not Implemented
OR0379 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,383 $7,000 Implemented
OR0379 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $9,673 $15,010 Not Implemented
OR0379 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,146 $0 Not Implemented
OR0379 # 04 Y:2000 04 2000 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,099 $885 Implemented
OR0379 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,229 $0 Not Implemented
OR0379 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,715 $4,000 Not Implemented
OR0379 # 07 Y:2000 07 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $9,628 $48,484 Implemented
OR0379 # 08 Y:2000 08 2000 OPTIMIZE PLANT POWER FACTOR $7,013 $19,600 Not Implemented
OR0379 # 09 Y:2000 09 2000 $1,026,000 $1,337,500 Not Implemented
AS0287 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,756 $17,407 Implemented
AS0287 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $315 Not Implemented
AS0287 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $501 $240 Implemented
AS0287 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $4,295 $4,875 Not Implemented
AS0287 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $572 $2,394 Not Implemented
AS0287 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,067 $24,000 Implemented
AS0287 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $668 $120 Not Implemented
AS0287 # 08 Y:2000 08 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,700 $60 Not Implemented
AS0287 # 09 Y:2000 09 2000 $37,832 $100,000 Not Implemented
CO0474 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,930 $10,000 Implemented
CO0474 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $560 Implemented
CO0474 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,060 $2,250 Not Implemented