IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0141 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,317 $203,719 Implemented
SU0141 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33,774 $0 Not Implemented
SU0141 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $17,677 $84,000 Not Implemented
SU0141 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $480 Implemented
SU0141 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $2,155 $1,110 Implemented
SF0245 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,917 $7,200 Not Implemented
SF0245 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,065 $4,060 Not Implemented
SF0245 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $4,115 Implemented
SF0245 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,585 $20,725 Implemented
SF0245 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $19,484 $97,649 Not Implemented
SF0245 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,738 $6,972 Implemented
SF0245 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,193 $0 Implemented
SF0245 # 08 Y:2002 08 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $74,335 $160,000 Not Implemented
SF0245 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $62,400 $250,000 Not Implemented
GT0744 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $861 $0 Not Implemented
GT0744 # 02 Y:2002 02 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,835 $0 Not Implemented
GT0744 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,070 $5,050 Not Implemented
GT0744 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $65,772 $108,000 Not Implemented
GT0744 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $22,535 $41,250 Implemented
GT0744 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $2,743 $1,200 Not Implemented
GT0744 # 07 Y:2002 07 2002 MODIFY WORKLOAD $27,000 $4,600 Implemented
IA0302 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,423 $6,500 Not Implemented
IA0302 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,323 $120 Not Implemented
IA0302 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $307 $333 Not Implemented
IA0302 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $409 $36 Not Implemented