IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0532 # 03 Y:2007 03 2007 AIR CONDITION ONLY SPACE NECESSARY $1,700 $5,200 Not Implemented
AM0532 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $670 $285 Implemented
AM0532 # 05 Y:2007 05 2007 ADD AREA LIGHTING SWITCHES $320 $65 Implemented
MA0622 # 01 Y:2007 01 2007 BURN A LESS EXPENSIVE GRADE OF FUEL $1,852,277 $4,120,500 Implemented
MA0622 # 02 Y:2007 02 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $653,801 $423,075 Implemented
MA0622 # 03 Y:2007 03 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $449,650 $250,000 Not Implemented
MA0622 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $337,840 $694,400 Implemented
MA0622 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $67,981 $60,600 Not Implemented
MA0622 # 06 Y:2007 06 2007 UPGRADE OBSOLETE EQUIPMENT $34,468 $111,500 Implemented
MA0622 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $21,165 $10,000 Implemented
MA0622 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,919 $30,500 Not Implemented
DL0006 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $3,642 $0 Implemented
DL0006 # 02 Y:2007 02 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,178 $0 Not Implemented
DL0006 # 03 Y:2007 03 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,925 $995 Not Implemented
UD0766 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $832,000 $400,000 Not Implemented
UD0766 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $942,000 $520,000 Not Implemented
UD0766 # 03 Y:2007 03 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $306,000 $20,000 Not Implemented
UD0766 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $164,851 $140,000 Not Implemented
UD0766 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,420 $279,770 Implemented
UD0766 # 06 Y:2007 06 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $57,000 $30,000 Not Implemented
UD0766 # 07 Y:2007 07 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,000 $1,100 Implemented
UD0766 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,800 $20,000 Implemented
UD0766 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $26,203 $10,000 Not Implemented
UD0766 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,343 $85,140 Implemented
UD0766 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,564 $19,275 Implemented