IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0933 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $10,455 $250 Implemented
GT0933 # 02 Y:2019 02 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $23,854 $13,713 Not Implemented
GT0933 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $213 Implemented
GT0933 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,851 $41,392 Implemented
GT0933 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $4,386 $6,741 Not Implemented
GT0933 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,768 $9,616 Implemented
GT0933 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $71,526 $507,835 Not Implemented
OK1017 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,604 $17,500 Not Implemented
OK1017 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $10,627 $231 Not Implemented
OK1017 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,220 $22,288 Not Implemented
OK1017 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $3,590 Not Implemented
OK1017 # 05 Y:2019 05 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,164 $0 Not Implemented
OR0724 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,104 $18,004 Not Implemented
OR0724 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,124 $3,891 Not Implemented
OR0724 # 03 Y:2019 03 2019 REPAIR AND ELIMINATE STEAM LEAKS $49,629 $100,000 Not Implemented
OR0724 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,637 $3,836 Not Implemented
OR0724 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,462 $218 Not Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
OR0723 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $21,541 $1,027 Not Implemented
OR0723 # 03 Y:2019 03 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,360 $1,789 Implemented
BS0128 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $341,674 $103,307 Not Implemented
BS0128 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $4,088 $5,932 Not Implemented
BS0128 # 03 Y:2019 03 2019 UPGRADE CONTROLS ON COMPRESSORS $5,952 $1,038 Not Implemented
BS0128 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,819 $308 Not Implemented
BS0128 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,574 $466 Not Implemented