IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0216 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $27,580 $412 Implemented
AM0216 # 09 Y:1994 09 1994 REDUCE OR ELIMINATE WASTE $5,515 $220 Implemented
AM0213 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $17,047 $13,000 Implemented
AM0213 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,235 $0 Implemented
AM0213 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $1,785 Implemented
AM0213 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $600 $2,100 Implemented
AM0213 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $680 $0 Implemented
AM0214 # 01 Y:1994 01 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $10,770 $200,000 Not Implemented
AM0214 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,160 $540 Not Implemented
AM0214 # 03 Y:1994 03 1994 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,350 $300 Not Implemented
AM0214 # 04 Y:1994 04 1994 USE OPTIMUM TEMPERATURE $790 $1,000 Not Implemented
AM0214 # 05 Y:1994 05 1994 ADJUST BURNERS FOR EFFICIENT OPERATION $450 $680 Implemented
AM0214 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $300 $0 Not Implemented
KG0003 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,276 $9,920 Implemented
KG0003 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,639 $2,314 Not Implemented
KG0003 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,257 $2,200 Implemented
KG0003 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $1,863 $100 Not Implemented
KG0003 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,629 $2,500 Implemented
KG0003 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $126 $155 Not Implemented
KG0003 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $372 $1,186 Implemented
AM0212 # 01 Y:1994 01 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $920 $3,180 Not Implemented
AM0212 # 02 Y:1994 02 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $550 $470 Not Implemented
AM0212 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $140 $0 Implemented
AM0212 # 04 Y:1994 04 1994 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $190 $580 Not Implemented
KG0002 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,655 $1,260 Implemented