IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0056 # 09 Y:1995 09 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $66,455 $6,100 Not Implemented
WV0056 # 10 Y:1995 10 1995 USE LESS WASTEFUL PACKAGING $9,764 $0 Not Implemented
WV0056 # 11 Y:1995 11 1995 USE LESS WASTEFUL PACKAGING $5,696 $0 Not Implemented
WV0055 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $1,558 Implemented
WV0055 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $500 Implemented
WV0055 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $768 $374 Implemented
WV0055 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $760 Implemented
WV0055 # 05 Y:1995 05 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,042 $18,000 Not Implemented
WV0055 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $21,174 $3,902 Not Implemented
WV0055 # 07 Y:1995 07 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,650 $3,780 Implemented
UD0452 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $620 $0 Not Implemented
UD0452 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,950 $0 Implemented
UD0452 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,856 $4,320 Not Implemented
UD0452 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $880 Not Implemented
UD0451 # 01 Y:1995 01 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,837 $2,000 Implemented
UD0451 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,100 $0 Implemented
UD0451 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,981 $4,440 Not Implemented
UD0451 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,000 $26,000 Not Implemented
UD0450 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,163 $0 Implemented
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,449 $10,000 Not Implemented
UD0450 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $250 Not Implemented
UD0450 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,370 $2,500 Not Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented