IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0518 # 01 Y:2018 01 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,874 $3,023 Not Implemented
SF0518 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,220 $4,857 Not Implemented
SF0518 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,611 $15,000 Not Implemented
SF0518 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $2,300 Not Implemented
SF0518 # 05 Y:2018 05 2018 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,098 $6,325 Not Implemented
SF0518 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $6,223 $45,702 Not Implemented
AM0750 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $6,550 $9,100 Implemented
AM0750 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,760 $1,500 Implemented
AM0750 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,550 Implemented
AM0750 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $780 $0 Not Implemented
AM0750 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $750 $2,880 Not Implemented
AM0750 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $6 Implemented
AM0750 # 07 Y:2018 07 2018 USE SYNTHETIC LUBRICANT $440 $0 Not Implemented
AM0750 # 08 Y:2018 08 2018 PAY UTILITY BILLS ON TIME $344 $0 Implemented
UU0132 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,322 $36,216 Implemented
UU0132 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,946 $600 Implemented
UU0132 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $5,976 $7,600 Implemented
UU0132 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,897 $1,428 Not Implemented
UU0132 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,767 $0 Implemented
UU0132 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $2,708 $3,750 Not Implemented
UU0132 # 07 Y:2018 07 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,935 $0 Not Implemented
UU0132 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,203 $0 Not Implemented
UU0132 # 09 Y:2018 09 2018 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $584 $0 Not Implemented
MI0331 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,963 $15,690 Implemented
MI0331 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $6,044 $5,800 Not Implemented