IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0464 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,300 $6,900 Implemented
OR0464 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,000 $800 Not Implemented
OR0463 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,060 $3,000 Implemented
OR0463 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $3,700 $0 Implemented
OR0463 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $26,000 $22,920 Not Implemented
OR0463 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,000 $10,000 Implemented
OR0463 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $73,800 $600 Implemented
OR0463 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,400 $1,000 Not Implemented
UU0067 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $25,126 $0 Implemented
UU0067 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,160 $200 Not Implemented
UU0067 # 03 Y:2004 03 2004 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $495 $400 Not Implemented
UU0067 # 04 Y:2004 04 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $0 Implemented
UU0067 # 05 Y:2004 05 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $40,000 Not Implemented
UU0067 # 06 Y:2004 06 2004 TREAT AND REUSE RINSE WATERS $635,880 $1,705,000 Not Implemented
UU0061 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,895 $18,633 Not Implemented
UU0061 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $1,000 Not Implemented
UU0061 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
UU0061 # 04 Y:2004 04 2004 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $18,030 $11,000 Not Implemented
UU0061 # 05 Y:2004 05 2004 CONTRACT OUT MAINTENANCE $15,000 $2,000 Not Implemented
UU0061 # 06 Y:2004 06 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $351 $432 Implemented
UU0056 # 01 Y:2003 01 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $335 $1,600 Not Implemented
UU0056 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $121 Implemented
UU0056 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $58 Implemented
UU0056 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $136 Not Implemented
UU0056 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $266 Not Implemented