Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0121 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $4,725 | Implemented |
IP0121 # 07 Y:2019 | 07 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,037 | $11,000 | Not Implemented |
IP0121 # 08 Y:2019 | 08 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,512 | $9,313 | Not Implemented |
IP0121 # 09 Y:2019 | 09 | 2019 | REPLACE BOILER | $11,538 | $50,526 | Not Implemented |
IP0121 # 10 Y:2019 | 10 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,795 | $17,400 | Implemented |
IP0120 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,145 | $4 | Implemented |
IP0120 # 02 Y:2019 | 02 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $835 | $0 | Implemented |
IP0120 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $348 | $0 | Not Implemented |
IP0120 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223 | $22 | Implemented |
IP0120 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $473 | $256 | Implemented |
IP0120 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,284 | $11,128 | Not Implemented |
IP0120 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,019 | $4,963 | Implemented |
IP0120 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,278 | $7,549 | Not Implemented |
IP0120 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $691 | $3,215 | Implemented |
IP0119 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $768 | $28 | Not Implemented |
IP0119 # 02 Y:2019 | 02 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,920 | $460 | Not Implemented |
IP0119 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,082 | $379 | Not Implemented |
IP0119 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,002 | $875 | Implemented |
IP0119 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $27,937 | $38,052 | Implemented |
IP0119 # 06 Y:2019 | 06 | 2019 | REPLACE BOILER | $20,712 | $66,681 | Implemented |
IC0217 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,543 | $6,600 | Implemented |
IC0217 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,588 | $1,928 | Not Implemented |
IC0217 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,925 | $300 | Implemented |
IC0217 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $62,274 | $210,000 | Not Implemented |
IC0217 # 05 Y:2019 | 05 | 2019 | BURN WOOD BY-PRODUCTS FOR HEAT | $5,683 | $15,144 | Implemented |