IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0508 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,607 $81,480 Not Implemented
WV0508 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,278 $1,000 Implemented
WV0508 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,854 $1,700 Implemented
WV0508 # 06 Y:2015 06 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,108 $7,873 Not Implemented
WV0508 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,521 $194 Implemented
WV0508 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $3,800 $545 Implemented
WV0508 # 09 Y:2015 09 2015 ISOLATE HOT OR COLD EQUIPMENT $3,639 $5,172 Not Implemented
WV0508 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,083 $29 Implemented
WV0508 # 11 Y:2015 11 2015 INSULATE BARE EQUIPMENT $733 $1,287 Implemented
WV0507 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,644 $4,100 Implemented
WV0507 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,825 $65,562 Not Implemented
WV0507 # 07 Y:2015 07 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $32,498 $1,000 Implemented
WV0507 # 08 Y:2015 08 2015 REPAIR OR REPLACE STEAM TRAPS $26,405 $14,973 Implemented
WV0507 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $25,719 $861 Implemented
WV0507 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18,016 $0 Implemented
WV0507 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,713 $6,794 Implemented
WV0507 # 12 Y:2015 12 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,922 $278 Implemented
WV0507 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $3,273 $6,566 Implemented
WV0507 # 14 Y:2015 14 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,967 $252 Implemented
WV0507 # 15 Y:2015 15 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $778 $597 Not Implemented
WV0507 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $352,153 $1,664,938 Not Implemented
WV0507 # 02 Y:2015 02 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $161,509 $150,000 Not Implemented
WV0507 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $71,462 $301,590 Not Implemented
WV0507 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,956 $60,015 Not Implemented
WV0504 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,508 $53,520 Not Implemented