IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0168 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $912 Not Implemented
KU0168 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Not Implemented
KU0169 # 01 Y:1985 01 1985 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,536,415 $7,700,000 Not Implemented
KU0169 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $48,005 $6,000 Implemented
KU0169 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,083 $5,000 Implemented
KU0169 # 04 Y:1985 04 1985 OPTIMIZE PLANT POWER FACTOR $7,711 $37,000 Implemented
KU0169 # 05 Y:1985 05 1985 INSTALL SET-BACK TIMERS $8,360 $622 Implemented
KU0169 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,219 $13,000 Implemented
KU0169 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $4,581 $1,700 Implemented
KU0169 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,579 $0 Implemented
KU0169 # 09 Y:1985 09 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,472 $500 Implemented
KU0169 # 10 Y:1985 10 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,251 $1,600 Not Implemented
KU0169 # 11 Y:1985 11 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,590 $50 Not Implemented
KU0169 # 12 Y:1985 12 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,444 $550 Implemented
KU0169 # 13 Y:1985 13 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,374 $580 Implemented
KU0169 # 14 Y:1985 14 1985 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $605 $0 Implemented
KU0169 # 15 Y:1985 15 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $50 Implemented
KU0169 # 16 Y:1985 16 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $549 $660 Implemented
KU0169 # 17 Y:1985 17 1985 INSTALL TIMERS AND/OR THERMOSTATS $218 $40 Not Implemented
KU0170 # 01 Y:1985 01 1985 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $97,361 $494,400 Not Implemented
KU0170 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $29,255 $18 Implemented
KU0170 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,755 $2,656 Implemented
KU0170 # 04 Y:1985 04 1985 REPAIR AND ELIMINATE STEAM LEAKS $5,297 $300 Implemented
KU0170 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,901 $6,000 Implemented
KU0170 # 06 Y:1985 06 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $1,746 $1,000 Implemented