IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0130 # 09 Y:1995 09 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,542 $34,200 Implemented
IA0130 # 10 Y:1995 10 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,419 $5,456 Not Implemented
IA0130 # 11 Y:1995 11 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,287 $0 Implemented
KG0038 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,010 $1,050 Implemented
KG0038 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,449 $722 Implemented
KG0038 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,105 $2,250 Implemented
KG0038 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $936 $1,744 Not Implemented
KG0038 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $40 Implemented
KG0038 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $296 $0 Implemented
KG0038 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $375 Implemented
UD0473 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,965 $8,000 Implemented
UD0473 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,762 $2,500 Not Implemented
UD0473 # 03 Y:1995 03 1995 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,523 $7,500 Not Implemented
UD0473 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,330 $18,955 Not Implemented
OR0248 # 01 Y:1995 01 1995 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $10,209 $0 Not Implemented
OR0248 # 02 Y:1995 02 1995 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $8,328 $250 Not Implemented
OR0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,459 $1,422 Not Implemented
OR0248 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $474 $1,045 Implemented
OR0248 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,487 $5,740 Not Implemented
OR0248 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $4,496 $20,400 Not Implemented
OD0044 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,852 $3,186 Implemented
OD0044 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $38,154 $31,020 Not Implemented
OD0044 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,367 $1,000 Implemented
ME0171 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $4,384 $0 Implemented
ME0171 # 02 Y:1995 02 1995 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,951 $3,480 Not Implemented