IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0302 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $156 Implemented
WV0348 # 01 Y:2006 01 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $22,813 $25,350 Implemented
WV0348 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $14,538 $3,000 Implemented
WV0348 # 03 Y:2006 03 2006 REDUCE VENTILATION AIR $10,762 $18,600 Not Implemented
WV0348 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,642 $8,678 Implemented
WV0348 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,373 $13,940 Not Implemented
WV0348 # 06 Y:2006 06 2006 REDUCE VENTILATION AIR $4,100 $6,800 Not Implemented
WV0348 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $0 Implemented
WV0348 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,808 $1,000 Implemented
WV0348 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,346 $2,540 Not Implemented
WV0348 # 10 Y:2006 10 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,322 $560 Implemented
WV0348 # 11 Y:2006 11 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,274 $470 Not Implemented
WV0348 # 12 Y:2006 12 2006 INSTALL OCCUPANCY SENSORS $1,202 $270 Not Implemented
WV0348 # 13 Y:2006 13 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,081 $1,100 Not Implemented
WV0348 # 14 Y:2006 14 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,057 $390 Implemented
WV0348 # 15 Y:2006 15 2006 DEVELOP A REPAIR/REPLACE POLICY $866 $680 Implemented
WV0348 # 16 Y:2006 16 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $266 Implemented
WV0348 # 17 Y:2006 17 2006 RECOVER WASTE HEAT FROM EQUIPMENT $528 $880 Not Implemented
UU0104 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,040 $10,000 Not Implemented
UU0104 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,420 $2,000 Not Implemented
UU0104 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,540 $3,530 Not Implemented
UU0104 # 04 Y:2006 04 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $104,490 $16,800 Not Implemented
UU0104 # 05 Y:2006 05 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $198,120 $1,974,210 Not Implemented
UU0104 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,650 $28,400 Not Implemented
UU0104 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $3,510 $8,490 Not Implemented