Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,165
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0263 # 03 Y:2025 | 03 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,365 | $1,730 | n/a |
UU0263 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,805 | $8,150 | n/a |
UU0263 # 05 Y:2025 | 05 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,948 | $2,110 | n/a |
UU0263 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,840 | $11,200 | n/a |
UU0263 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,270 | $7,380 | n/a |
UU0263 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $945 | $3,580 | n/a |
UU0263 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,940 | $9,000 | n/a |
UU0263 # 10 Y:2025 | 10 | 2025 | PAY UTILITY BILLS ON TIME | $1,860 | $1,500 | n/a |
UU0263 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,090 | $5,000 | n/a |
UU0263 # 12 Y:2025 | 12 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,910 | $158,576 | n/a |
UD1099 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,391 | $0 | n/a |
UD1099 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,105 | $0 | n/a |
UD1099 # 03 Y:2025 | 03 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,162 | $0 | n/a |
UD1099 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $568 | $0 | n/a |
UD1099 # 05 Y:2025 | 05 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,633 | $1,322 | n/a |
UD1099 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $2,877 | $3,498 | n/a |
UD1099 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,580 | $5,371 | n/a |
UD1099 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $283 | $953 | n/a |
UD1099 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,032 | $480,632 | n/a |
DL0248 # 01 Y:2025 | 01 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,580 | $0 | n/a |
DL0248 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,209 | $291 | n/a |
DL0248 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $5,964 | $373 | n/a |
DL0248 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,139 | $10,680 | n/a |
DL0248 # 05 Y:2025 | 05 | 2025 | USE OPTIMUM TEMPERATURE | $1,534 | $550 | n/a |
DL0248 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,995 | $4,980 | n/a |