IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0109 # 09 Y:1991 09 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,254 $0 Implemented
WI0109 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $225 $0 Implemented
WI0106 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $32,440 $10,800 Not Implemented
WI0106 # 02 Y:1991 02 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,780 $10,000 Not Implemented
WI0106 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $3,515 Not Implemented
WI0106 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,862 $800 Not Implemented
WI0106 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,351 $600 Not Implemented
WI0106 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,015 $500 Not Implemented
WI0106 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $958 $1,000 Not Implemented
WI0106 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $912 $1,500 Not Implemented
WI0106 # 09 Y:1991 09 1991 INSTALL STORM WINDOWS AND DOORS $733 $1,544 Not Implemented
WI0106 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $383 $0 Not Implemented
WI0106 # 11 Y:1991 11 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $299 $0 Not Implemented
WI0106 # 12 Y:1991 12 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,220 $0 Not Implemented
WI0107 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,375 $1,250 Implemented
WI0107 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $2,980 Implemented
WI0107 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,338 $2,250 Implemented
WI0107 # 04 Y:1991 04 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,427 $2,100 Implemented
WI0107 # 05 Y:1991 05 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $765 $0 Implemented
WI0107 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $332 $0 Implemented
WI0107 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $72 $160 Implemented
WI0107 # 08 Y:1991 08 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,042 $5,000 Implemented
WI0108 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,400 $10,000 Implemented
WI0108 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $232 Implemented
WI0108 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,190 $400 Implemented